Tuesday, July 15, 2008

T minus 28 Days

Well under a month to go, getting close. The Eaves Troughs were put in yesterday, but we noticed an issue.
If you look where the Eaves meet the roof bottom left in the photo, you can see the capping and eaves don't meet properly to the roof. You can see wood poking up. I don't know if the cap is on incorrect, or the shingles, but an issue that needs fixing for sure. As you can also see in the picture, the light fixtures are up. Outside there are 3, either side of the Garage, and outside the door.
There is a close up of the outdoor fixtures. Yes CFL bulbs too.

I don't know if they installed all the fixtures inside , but from the windows I could see the Dining Room fixture was up, and the Powder Room was in as well.
The Air conditioner is installed and running, pretty quiet it seems. I guess it is a mid line Lennox Model. Energy Star certified, fairly efficient, and quiet.
The hardwood flooring has been delivered as well. Boxes are piled up in the livingroom area. I tried looking online for it , but it seems the "model" we chose doesn't exist on their website or the pamphlet. I can see that it IS the correct stuff, LM Flooring, Gevaldo Plank, White Oak stained Walnut, says it on the box. I just can't find any reference online to it. Could be a builder only model?

I have been asked to post the photos of the Loft I took on the weekend to see the railings and the paint, so here goes.
The railing on the floor goes at the bottom of the stairs, probably much easier to move around without it on the wall.
And the other side. Hopefully it looks even better with carpet installed.